"git@eicweb.phy.anl.gov:containers/eic_container.git" did not exist on "b3c2ecb77cf28ac0b1361342c84993f8df96ab8b"
Newer
Older
## Tasks
### EIC
1. Beam pipe and beamline final focusing quads (FFQ)
2. Roman pot detectors placed with a quad and dipole in between the IR and detectors.
3. RICH material (no optical photons) and simple digitization.
4. ACTS integration
5. CLEO magnet field map
6.
### SoLID
1. Update magnet geometry (10 ft from end of magnet to calorimeter). See J. Benesch doc.
2. Gas cherenkov materials.