Newer
Older
## Tasks
### EIC
1. Beam pipe and beamline final focusing quads (FFQ)
2. Roman pot detectors placed with a quad and dipole in between the IR and detectors.
3. RICH material (no optical photons) and simple digitization.
4. ACTS integration
5. CLEO magnet field map
6.
### SoLID
1. Update magnet geometry (10 ft from end of magnet to calorimeter). See J. Benesch doc.
2. Gas cherenkov materials.