Skip to content
Snippets Groups Projects

Update zdc_sipmontile_reconstruction.py

Open Sebouh Paul requested to merge sebouh137-master-patch-84798 into master

Increased maximum hit energy in digitization for the SiPM-on-tile ZDC from 200 MeV to 800 MeV. This is necessary for proper reconstruction of photon showers, which can have a much larger maximum amount of energy per hit due to the showers being less spread-out than neutron showers.

Merge request reports

Loading
Loading

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading