Closed
Milestone Mar 24, 2020–Nov 3, 2020

EIC beamline and IR integration

Implement accelerator and beamline components.

  • Beampipe at IR
  • Quads and dipoles in the forward/backward directions
  • Magnetic fields

EIC at BNL Design Study: https://wiki.bnl.gov/eic/upload/EIC.Design.Study.pdf

Yellow report meeting at Temple: https://indico.bnl.gov/event/7449/timetable/?view=standard

https://indico.bnl.gov/event/7449/contributions/35464/attachments/27129/41355/2020-03-19_IRStatus.pdf

Baseline parameters: https://brookhavenlab.sharepoint.com/❌/s/eRHIC/bnl&slac/ESBW8F9WAsdMqNAod1r127YB4wY1r1Xz-T0me06QpZMjPw?rtime=ofBMpVjX10g

EIC Detector Infrastructure at BNL:

  • https://indico.bnl.gov/event/7449/contributions/36039/attachments/27201/41474/EIC_Detector_Infrastructure_-_Breitfeller.pdf
  • https://indico.bnl.gov/event/7449/contributions/36083/attachments/27294/41633/2020-03-21-integration-summary.pdf

From the EIC at BNL Design Study:

https://wiki.bnl.gov/eic/upload/EIC.Design.Study.pdf

image

image

image

image

image

image

image

image

  • Work items 6
  • Merge requests 6
  • Participants 3
  • Labels 10
Loading
Loading
Loading
Loading
83% complete
83%
Start date
Mar 24, 2020
Mar 24
-
Nov 3 2020
Due date
Nov 3, 2020 (Past due)
6
Work items 6 New issue
Open: 1 Closed: 5
6
Merge requests 6
Open: 0 Closed: 0 Merged: 6
0
Releases
None
Reference: EIC/NPDet%"EIC beamline and IR integration"