Skip to content

GitLab

  • Projects
  • Groups
  • Snippets
  • Help
    • Loading...
  • Help
    • Help
    • Support
    • Community forum
    • Submit feedback
    • Contribute to GitLab
  • Sign in / Register
N
NPDet
  • Project overview
    • Project overview
    • Details
    • Activity
    • Releases
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
  • Issues 11
    • Issues 11
    • List
    • Boards
    • Labels
    • Service Desk
    • Milestones
  • Merge Requests 2
    • Merge Requests 2
  • CI / CD
    • CI / CD
    • Pipelines
    • Jobs
    • Schedules
  • Operations
    • Operations
    • Incidents
    • Environments
  • Packages & Registries
    • Packages & Registries
    • Container Registry
  • Analytics
    • Analytics
    • CI / CD
    • Repository
    • Value Stream
  • Wiki
    • Wiki
  • Snippets
    • Snippets
  • Members
    • Members
  • Activity
  • Graph
  • Create a new issue
  • Jobs
  • Commits
  • Issue Boards
Collapse sidebar
  • EIC
  • NPDet
  • Milestones
  • EIC beamline and IR integration

Past due
Milestone Mar 24, 2020–Nov 3, 2020

EIC beamline and IR integration

Implement accelerator and beamline components.

  • Beampipe at IR
  • Quads and dipoles in the forward/backward directions
  • Magnetic fields

EIC at BNL Design Study: https://wiki.bnl.gov/eic/upload/EIC.Design.Study.pdf

Yellow report meeting at Temple: https://indico.bnl.gov/event/7449/timetable/?view=standard

https://indico.bnl.gov/event/7449/contributions/35464/attachments/27129/41355/2020-03-19_IRStatus.pdf

Baseline parameters: https://brookhavenlab.sharepoint.com/❌/s/eRHIC/bnl&slac/ESBW8F9WAsdMqNAod1r127YB4wY1r1Xz-T0me06QpZMjPw?rtime=ofBMpVjX10g

EIC Detector Infrastructure at BNL:

  • https://indico.bnl.gov/event/7449/contributions/36039/attachments/27201/41474/EIC_Detector_Infrastructure_-_Breitfeller.pdf
  • https://indico.bnl.gov/event/7449/contributions/36083/attachments/27294/41633/2020-03-21-integration-summary.pdf

From the EIC at BNL Design Study:

https://wiki.bnl.gov/eic/upload/EIC.Design.Study.pdf

image

image

image

image

image

image

image

image

  • Issues 7
  • Merge Requests 6
  • Participants 3
  • Labels 8
57% complete
57%
Start date
Mar 24, 2020
Mar 24
-
Nov 3 2020
Due date
Nov 3, 2020 (Past due)
7
Issues 7 New issue
Open: 3 Closed: 4
6
Merge requests 6
Open: 0 Closed: 0 Merged: 6
0
Releases
None
Reference: EIC/NPDet%"EIC beamline and IR integration"